Location : Arzew, Algeria – AFRICA
Duration : 2009-2011
Quantity : 15,000 MT
Scope : Supply of structural steel for Pipe rack, Equipment structures, Shelters, & Catwalks.
Location : Arzew, Algeria – AFRICA
Duration : 2009-2011
Quantity : 15,000 MT
Scope : Supply of structural steel for Pipe rack, Equipment structures, Shelters, & Catwalks.
Location : Talara, Peru – SOUTH AMERICA
Duration : 2015-2016
Quantity : 10,000 MT
Scope : Supply of structural steel for Pipe rack & Equipment Structure.
Location : Sumgayit City, Azerbaijan – CENTRAL ASIA
Duration : 2014 -2016
Quantity : 6,500 MT
Scope : Supply & Fabrication of Pipe racks, Equipment Structures, Building & Shelters.
Location : Corinth, Greece – EUROPE
Duration : 2009-2010
Quantity : 2,000 MT
Scope : Supply of structural steel for Pipe-racks & Equipment Structure.